Wold Engineering, P.C. was hired by the Contractor to perform Contractor Quality Control and Surveying for this project.  The project consisted of replacement of old bridge, new bridge construction including piling, abutment construction and precast box beam placement, railing and HMA paving.  As QC we working along with the FHWA Project Engineer to ensure that the work performed and materials used all met FHWA specifications.  All necessary documents pertaining to the project were submitted to the FHWA.